Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular

MOQ
25 Ton
Application
Power Plant/ Chemical/ Fire Equipment
End
Bevel End/Be/Buttweld, PE/ Plain End
Length
1--12m ,According to Customer Requirements
Thickness
1mm- 60mm and as Requirement
Shape
Round/Square/Rectangle
out Diameter
10-1420mm or Customed
Grade
A106(B,C), 10#, 45#, 20#, S
Name
Seamless Steel Pipe/Tube
Transport Package
Standard Sea-Worthy Packing
Specification
100-900mm or cut at your request Width 50-400mm We
Trademark
Yegang
Origin
Jinan City Shandong Povince China
HS Code
7202490000
Production Capacity
2000ton/ Month
Reference Price
$ 540.00 - 585.00

Product Description

Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular Yegang steel products include carbon steel, stainless steel, steel pipe, steel coil, steel plate, building materials: steel bar, wire rod, spiral spiral, round steel; pipe material: seamless pipe, welded pipe; plate material: cold and hot rolled plate/coil, medium and heavy plate, Color-coated sheet (galvanized sheet, color-coated sheet, tinplate, galvanized aluminum steel sheet), silicon steel, strip steel; steel profiles: working angle groove, H-beam, square steel, flat steel, bulb flat steel; 72 kinds of steel, 2900 Multiple specifications, more than 200,000 tons in stock. Complete variety, sufficient stock, good quality, low price, short delivery time and good service are our traditional advantages.

Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular
Product Name            Carbon Steel  Pipe
Place of Origin:          Shandong, China
Grade                 A106(B,C), 10#, 45#, 20#, St37-2, ST52, ST37
Thickness               1mm - 60mm
Section Shape           Round
Tolerance:               ± 1%
Application              Structure Pipe
Technique             Hot Rolled
Standard                API 5L, ASTM A106-2006, ASTM A53-2007, ASTM A1020-2002, GB 6479-2000, GB 5310-1995, JIS G3444-2006
Price Term:             CIF CFR FOB EX-WORK
MOQ:                  25 Ton
Payment Term:           30%T/T Advance + 70% Balance
Packing:                 Standard Sea-worthy Packing
Type:                   round
Certification:            ISO,CE

Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular
Carbon steel pipe is a kind of long steel with hollow section and no seams around it. It is a kind of economic section steel,seamless steel pipe according to the different cross sectional area shape can be divided into round pipe and special-shaped pipe. Using seamless steel pipe to manufacture ring parts can improve the material utilization rate, simplify the manufacturing process, and save the material and processing time. Widely used in manufacturing structural parts and mechanical parts etc.

Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular
Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular    Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular
Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular

Fire Fighting Seamless ERW Sch 40 80 Carbon Steel Galvanized Steel Pipe Welded 6m Tubepopular
 



FAQ
1.Q: Are you a factory or a trading company?                                    
A: We are not only the professional manufacturer with more than 10 years experience. We are professional manufacturer for steel pipe, and our company also is a very professional trade company for steel products.we can also provide a wide range of steel products.
2.Q: Can you provide samples?
A: Yes, if the sample is available in stock.
3.Q: Can you arrange the shipment?
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
4.Q: What is the delivery time?
A: It is based on the order, normally 15 - 20 days after receiving the deposit
5.Q: Do you have quality control?
A: Yes, we have gained BV, SGS authentication.

 

 

GOUV.NE, 2023