PXB110A
120L-160L Blow Molding Machine
- Double Drawbar clamping mechanism
- Perfect Usage for Chemical Drum, Road barrier, ABS car bumper
- High clamping force with short production cycle
- Patented Technology Die head system
- Optional Transparent line
Configuration List
PLC
|
MITSUBISHI
|
Japan
|
Touch Screen
|
HITECH
|
Taiwan
|
Inverter
|
MITSUBISHI
|
Japan
|
Power Supply
|
MEAN WELL
|
Taiwan
|
Relay
|
OMRON
|
Japan
|
Hydraulic Valves
|
YUKEN
|
Japan
|
Hydraulic Pump
|
YUKEN
|
Japan
|
Contactors
|
LS(LG)
|
Korea
|
Solid relay
|
FOTEK
|
Japan
|
Breaker
|
LS(LG)
|
Korea
|
Temperature Control Module
|
MITSUBISHI
|
Japan
|
Oil Sealing
|
DZ
|
Taiwan
|
Oil Tube
|
LIEBAO
|
Taiwan
|
Transducer
|
GEFRAN
|
Italy
|
Proximity Switch
|
SONON
|
China
|
Motor
|
SIEMENS
|
China
|
Air Valve
|
FESTO
|
Germany
|
Parison Controller
|
Moog
|
Japan
|
Servo Valve
|
Moog
|
Japan
|
Parameters:
Material
|
|
PE,PP,ABS...
|
Max container capacity
|
L
|
160
|
Output(dry cycle)
|
pc/hr
|
300
|
Machine dimension(L×W×H)
|
M
|
6.8
×
3.3
×
5.0
|
Machine weight
|
T
|
23
|
Clamping Unit
|
|
|
Clamping force
|
kn
|
880
|
Mold platen size(W×H)
|
mm
|
1100
×
1400
|
Platen opening stroke
|
mm
|
600-1400
|
Platen moving stroke
|
mm
|
800
|
Max mold size(W×H)
|
mm
|
1000×
1600
|
Mold thickness
|
mm
|
610-700
|
Power
|
|
|
Servo oil pump motor power
|
KW
|
22
|
Servo pump displacement
|
L/MIN
|
150
|
Blow pressure
|
MPA
|
1
|
Air consumption
|
M3/MIN
|
1.8
|
Cooling water pressure
|
mpa
|
0.5
|
Water consumption
|
L/min
|
60
|
Average energy consumption
|
KW
|
70-80
|
Extruder unit
|
|
|
Screw diameter
|
mm
|
110
|
Screw L/D ratio
|
L/D
|
25
|
HDPE Melting capacit for HDPE
|
kg/hr
|
180-220
|
Number of heating zone
|
zone
|
6
|
Screw heating power
|
kw
|
30.2
|
Screw fan power
|
KW
|
0.6
|
Extruder motor power
|
kw
|
75
|
Die head
|
|
|
Number of heating zone for single die head
|
zone
|
6
|
Heating power for single die head
|
kw
|
31.2
|
Max die-pin diameter
|
mm
|
520
|
Accumulator capacity
|
L
|
15(20)
|
(HDPE) Accumulator weight(HDPE)
|
KG
|
11(15)
|
Delivery Time:
- No later than 65 days after receipt of the deposit
Training:
- We provide training service for two or three operating men for free (but the cost for trainer's board and lodging is not included).
Installation:
- The supplier will send one specialist to test run the machine until it is running in normal state.
Guarantee:
- Our guarantee is valid for a period of 12 months. If the malfunction caused of the machine's self quality, we will troubleshoot it for free.
Auxiliary Equipments:
- Auxiliary equipments for production line are available and optional, please kindly ask for quotation.