High Quality Dissolved Air Flotation Products to Fish Farms Wastewater Treatment

Model NO.
GF air flotation
Transport Package
Rain-Proof Package
Trademark
GYE
Origin
China
HS Code
8421219990
Production Capacity
700sets/Year
Reference Price
$ 8,262.00 - 9,180.00

Product Description

 

Product Description

    DAF unit is mainly used for removing suspened solids, oil and grease wastewater in WWTP pre-treatment stage.
    Flotation techology adopts highly-dispersed micro-bubbles to adhere with the tiny solids in the wastewater. After successfully combination, it will become flocs which can float up to the water surface. At this time, our DAF skimmer will scrape out the flocs and produce the cleaned water. 
    This is our sedimentation DAF is combined with DAF tank, saturation system, sludge skimmer, effluent collection tank, level adjustment, reaction tank and sludge hopper at the tank bottom.
 

Detailed Photos

High Quality Dissolved Air Flotation Products to Fish Farms Wastewater Treatment High Quality Dissolved Air Flotation Products to Fish Farms Wastewater Treatment High Quality Dissolved Air Flotation Products to Fish Farms Wastewater Treatment

Product Parameters
Model Capacity (m3/h) Pump(KW) Air compressor (KW) Skimmer(KW) Mixer(KW) Total power(KW)
GF-1T 1m3/h 0.55 0.55 0.18 0.37*2 2.02
GF-2T 2m3/h 0.55 0.55 0.18 0.37*2 2.02
GF-3T 3m3/h 1.1 0.55 0.20 0.40*2 2.65
GF-5T 5m3/h 1.1 0.55 0.20 0.40*2 2.65
GF-10T 10m3/h 1.5 0.75 0.20 0.40*2 3.25
GF-15T 15m3/h 2.2 0.75 0.40 0.75*2 4.85
GF-20T 20m3/h 2.2 0.75 0.40 0.75*2 4.85
GF-30T 30m3/h 5.5 0.75 0.40 0.75*2 8.15
GF-40T 40m3/h 5.5 0.75 0.40 0.75*2 8.15
GF-50T 50m3/h 7.5 1.5 0.40 0.75*2 10.90
GF-60T 60m3/h 7.5 1.5 0.40 0.75*2 10.90
GF-70T 70m3/h 11 2.2 0.40 0.75*2 15.10
GF-80T 80m3/h 11 2.2 0.40 0.75*2 15.10
GF-90T 90m3/h 15 2.2 0.40 0.75*2 19.10
GF-100T 100m3/h 15 2.2 0.40 0.75*2 19.80
Packaging & Shipping

High Quality Dissolved Air Flotation Products to Fish Farms Wastewater Treatment

 

After Sales Service

After-sale service commitment
1. After-sale service department:
 Gongyuan Group has set up a after-sale service department. Our engineer can go to oversea sites for guide installation and commission.
2. Payment of maintenance expanse:
 All the maintenance expense within the guaranteed period shall be borne by GYE except artifical damage.
3.Beyond the warranty period, we promises lifelong regular after-sale connection.

FAQ

1. Your wastewater quality data and type
2. Your wastewater capacity
3. Your material requirement about DAF tank
4. Your industrial voltage

 

 

 

 

 

 

 

GOUV.NE, 2023