Hnarl Construction Machine Parts DL-00003092 Dingli Jcpt0607dcs Brake

نموذج رقم.
DL-00003092
مستوى الجودة
أداء عالٍ
التطبيق 1
يستخدم لرافعة المقص Dingli jcpt0607dcs
الوزن
1.5 كجم
الأسهم
كفى
تصنيع المعدات المتوافقة
دينجلي
رقم القطعة
DL-00003092
نوع المعدات المتوافقة
رفع المقص
نوع الجزء
مكبح رفع المقص
حزمة النقل
Standard Export Packing
تخصيص
21X21X20 cm
العلامة التجارية
HNARL
الأصل
China
القدرة الإنتاجية
500pieces/Week
السعر المرجعي
$ 4,050.00 - 4,500.00

وصف المنتجات

Hnarl Construction Machine Parts Dl-00003092 Dingli Jcpt0607dcs Brake
HNARL Construction Machine Parts DL-00003092 DINGLI JCPT0607DCS Brake
Parts No:
DL-00003092
Application:
Used for DINGLI scissor lift JCPT0607DCS
 
Packing Specifications:
Length (mm)
130
Width (mm)
130
Height (mm)
60
Weight (kg)
1.5
 
Hnarl Construction Machine Parts Dl-00003092 Dingli Jcpt0607dcs Brake
 
 
Hnarl Construction Machine Parts Dl-00003092 Dingli Jcpt0607dcs Brake
Hnarl Construction Machine Parts Dl-00003092 Dingli Jcpt0607dcs Brake


Hnarl Construction Machine Parts Dl-00003092 Dingli Jcpt0607dcs BrakeHnarl Construction Machine Parts Dl-00003092 Dingli Jcpt0607dcs Brake
Product Delivery
Shipping Time
Start & End
Descriptions
By Express.
DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect
3-8 working days
Door to Door
For Small order, Sample order, Trial order
Fast & Convenient
Air Transportation
By Plane
5-10 working days
Door to Airport
For Medium order
Fast & Cheaper than express
The consignee needs to take delivery at the airport
Sea Transportation
By Vessel
20-45 days
Door to Seaport
For Mass order
Cheap but take time
The consignee needs to take delivery at the seaport
Hnarl Construction Machine Parts Dl-00003092 Dingli Jcpt0607dcs Brake
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.

Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.

Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
 
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.

 

قطع غيار آلات الهندسة والبناء

GOUV.NE, 2023