
HNARL Genie Replacement Parts Genie Air Filter 27916 27916GT Genie air filter |
Parts No: | 27916GT |
Used for GENIE Telescopic Boom Lift Models | S-40, S-45, S-60, S-65, S-80, and S-85. |
Fits GENIE Articulated Boom Lift Models | Z-45/25J IC, Z-45/25 IC, Z-45/25, Z-45 XC, Z-60/34, and Z-62/40. |
Fits GENIE Scissor Lift Model | GS-3384 |
Packing Specifications: |
Length (mm) | 290 |
Width (mm) | 132 |
Height (mm) | 132 |
Weight (kg) | 1 |
Features:
(1) Imported cellulose fiber or synthetic fiber for base media
(2) Excellent filter efficiency.
(3) Wide pleat spacing, great filter surface.
(4) Electrochemical plate top and bottom, no rust.
(5) Perforated zinc galvanized metal inner core, allows good airflow.
(6) Specialty chlorine rubber gasket to ensure airtight sealing.
(5) Abrasion resistance: Excellent (6) Chemical tolerance: Excellent
(7 )Gasket: Neoprene rubber, good at absolute hermetic seal, improving the durability and life. (8) inside cage: Galvanized steel, to prevent corrosion.
(9)Molded top: Available in a varitety of styles and sizes to fit a wide range of Tubesheet Holes.
(10) Molded bottom: Helps resist abrasive wear at the bottom of the elements

Product Delivery | Shipping Time | Start & End | Descriptions |
By Express. DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect | 3-8 working days | Door to Door | For Small order, Sample order, Trial order Fast & Convenient |
Air Transportation By Plane | 5-10 working days | Door to Airport | For Medium order Fast & Cheaper than express The consignee needs to take delivery at the airport |
Sea Transportation By Vessel | 20-45 days | Door to Seaport | For Mass order Cheap but take time The consignee needs to take delivery at the seaport |
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.