طقم فرشاة موتور Hnarl JLG مع مجموعة فرشاة Springs 7016781

نموذج رقم.
7016781
مستوى الجودة
أداء عالٍ
التطبيق 1
يستخدم لـ JLG 800a، و800aj، و1532e، و1932e، و2033e، 2046هـ
الوزن
0.2 كجم
الأسهم
كفى
تصنيع المعدات المتوافقة
JLG
رقم القطعة
7016781
نوع المعدات المتوافقة
رفع المقص
نوع الجزء
طقم فرشاة مع يايات
حزمة النقل
Standard Export Packing
تخصيص
18X18X6 cm
العلامة التجارية
HNARL
الأصل
China
القدرة الإنتاجية
500pieces/Week
السعر المرجعي
$ 4,801.50 - 4,950.00

وصف المنتجات

Hnarl Jlg Motor Brush Kit with Springs 7016781 Brush Set
HNARL JLG Motor Brush Kit with Springs 7016781 Brush Set
Brush Set
Brand:
Aerial Power Parts
Part No.:
 7016781 7010639
Application:
Used for JLG 800A,800AJ,1532E, 1932E ,2033E ,2046E ,2646E ,2658E
 
Packing Specifications:
Length (mm)
120
Width (mm)
22
Height (mm)
40
Weight (kg)
0.2
 
Hnarl Jlg Motor Brush Kit with Springs 7016781 Brush Set
Hnarl Jlg Motor Brush Kit with Springs 7016781 Brush Set
Hnarl Jlg Motor Brush Kit with Springs 7016781 Brush Set
Description:
JLG 7016781 Brush Set, With Springs
7016781: jlg oem kit, brush w/springs
JLG Part 7016781 - JLG Motor Brush Kit With Springs
Purchase 7016781 KIT, BRUSH W/SPRINGS JLG Parts
Hnarl Jlg Motor Brush Kit with Springs 7016781 Brush SetHnarl Jlg Motor Brush Kit with Springs 7016781 Brush Set
Product Delivery
Shipping Time
Start & End
Descriptions
By Express.
DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect
3-8 working days
Door to Door
For Small order, Sample order, Trial order
Fast & Convenient
Air Transportation
By Plane
5-10 working days
Door to Airport
For Medium order
Fast & Cheaper than express
The consignee needs to take delivery at the airport
Sea Transportation
By Vessel
20-45 days
Door to Seaport
For Mass order
Cheap but take time
The consignee needs to take delivery at the seaport
Hnarl Jlg Motor Brush Kit with Springs 7016781 Brush Set
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.

Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.

Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
 
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.

 

قطع غيار آلات الهندسة والبناء

GOUV.NE, 2023