Drie schroeffilms blazermachine
MODEL | HLD45-700F | HLD55 - 900F | HLD65 - 1300F |
GESCHIKT MATERIAAL | HDPE, LDPE, LLDPE | HDPE, LDPE, LLDPE | HDPE, LDPE, LLDPE |
LAAGNUMMER | 1-laags | 1-laags | 1-laags |
DIKTE VAN DE FOLIE |
HD: 0.009
MM
LD: 0.03 MM |
HD: 0.009
MM
LD: 0.03 MM |
HD: 0.009
MM
LD: 0.03 MM |
MAX. VERMOGEN | 60 KG/UUR | 80 KG/H | 150 KG/UUR |
MAX. FILMBREEDTE | 600 MM | 800 MM | 1200 MM |
EXTRUSIE -EENHEID | |||
SCHROEFDIAMETER | Φ45X1 | Φ55X1 | Φ65X1 |
SCHROEF L/D-VERHOUDING | 30/1 | 30/1 | 30/1 |
SCHROEFMATERIAAL | BIMETAAL | BIMETAAL | BIMETAAL |
MATERIAAL VAN DE CILINDER | BIMETAAL | BIMETAAL | BIMETAAL |
THERMOREGELING VAN DE CILINDER | 3 X 1 | 3 X 1 | 3 X 1 |
KOELVENTILATOR VAN CILINDER | 200WX3X1 | 200WX3X1 | 200WX3X1 |
SCHERMWISSELAAR | STANDAARD | STANDAARD | STANDAARD |
AANDRIJFMOTOR | 15KWX1 SIEMENS | 18KWX1 SIEMENS | 30KWX1 SIEMENS |
VERSNELLINGSBAK | #145 | # 180 | # 200 |
EXTRUSIE -MATRIJSEENHEID | |||
STERVEN | HDΦ60 -80 MM | HDΦ80 -100 MM | HDΦ100 -120 MM |
DIE THEROMO-CONTROLE | 2 | 2 | 2 |
LUCHTRING | DUBBELE LIP | DUBBELE LIP | DUBBELE LIP |
THERMISCHE FLANGE-REGELING | 2 | 2 | 2 |
LUCHTBLAZER | 2.2 KW | 3.7 KW | 5.5 KW |
TYPE OVERNEMEN | OMHOOG EN OMLAAG | OMHOOG EN OMLAAG | OMHOOG EN OMLAAG |
NEEM DE UNIT OP. | |||
MATERIAAL VAN DE KOOI VOOR LUCHTBELLEN | HOUT | HOUT | HOUT |
NIP-MATERIAAL BOVEN | HOUT | HOUT | HOUT |
NEEM HET ROLMATERIAAL OP. | HIGH TEMP-RUBBER | HIGH TEMP-RUBBER | HIGH TEMP-RUBBER |
LENGTE OPPAKROL | 700 MM | 900 MM | 1300 MM |
HOEKPLAAT | INCLUSIEF | INCLUSIEF | INCLUSIEF |
OPTAKE-UP MOTOR | 1,5KW-TANDWIELMOTOR | 1,5KW-TANDWIELMOTOR | TANDWIELMOTOR VAN 2,2 KW |
OPNEEM SNELHEID | 10 M/MIN. | 10 M/MIN. | 10 M/MIN. |
KLEMPATROON | PNEUMATISCH | PNEUMATISCH | PNEUMATISCH |
TYPE WIKKELING | ENKELE HANDMATIGE WIKKELAAR | ENKELE HANDMATIGE WIKKELAAR | ENKELE HANDMATIGE WIKKELAAR |
WIKKELEENHEID | |||
LENGTE VAN DE ROL VAN DE WIKKELING | 700 MM | 900 MM | 1300 MM |
AS VAN DE WIKKELINGEN | STOP SHAFTX2 | STOP SHAFTX2 | STOP SHAFTX2 |
BANAANROL | INCLUSIEF | INCLUSIEF | INCLUSIEF |
MAX. DIA. VAN ROL MET LIER | 800 MM | 800 MM | 800 MM |
WIKKELMOTOR | TORSIEMOTOR MET DELTA-INVERTOR, TAIWAN-ONTWERP | TORSIEMOTOR MET DELTA-INVERTOR, TAIWAN-ONTWERP | TORSIEMOTOR MET DELTA-INVERTOR, TAIWAN-ONTWERP |
CRUISE CONTROL | TOERENTALREGELAAR | TOERENTALREGELAAR | TOERENTALREGELAAR |
VERWARMING | ACR+PID (ENERGIEBESPARING) | ACR+PID (ENERGIEBESPARING) | ACR+PID (ENERGIEBESPARING) |
ELEKTRISCHE BEDIENINGSKAST | |||
TEMP. CONTROLLER | OMRON | OMRON | OMRON |
BEDRIJFSSPANNING | 380 V, 50 HZ | 380 V, 50 HZ | 380 V, 50 HZ |
MERK INVERTER | DELTA (TAIWAN) | DELTA (TAIWAN) | DELTA (TAIWAN) |
SOLID-STATE-RELAIS ( SSR ) | FOTEK (TAIWAN) | FOTEK (TAIWAN) | FOTEK (TAIWAN) |
A. wanneer uw bedrijf is gevonden?
B. ons verkoopteam heeft meer dan 15 jaar ervaring in de kunststofmachineindustrie.
A. wat zijn de producten die u levert?
B. wij zijn fabrikant van kunststof/biologisch afbreekbare filmblazermachine, zakmachine, drukmachine, plastic recyclingmachine, etc.
A.Hoe zit het met uw productgarantie ?
B.One year(12 months) de garantie zal worden gegeven vanaf de datum van aankomst van de container Clients'factory.If machineonderdelen gebroken zijn als gevolg van kwaliteitsprobleem binnen de garantieperiode, zullen we gratis een nieuw onderdeel sturen (elk kunstmatig misbruik of destiny-dupe valt niet onder de beperking van de Kwaliteitsgarantie).
A. wat zijn uw betalings- en leveringsvoorwaarden?
B. betalingstermijn:
1) T/T, 30% als vooruitbetaald, 70% voor levering
2) L/C, 30% bij T/T, 70% als L/C in zicht, en voor klanten uit Bangladesh&Ethiopië accepteren we 100% L/C in zicht.
Levertijd: Standaard is dit 30-40 werkdagen
A. welke technische ondersteuning kunnen we krijgen als we machines bestellen
B.we kunnen installatietekeningen, basisinstructies, uitleg over de bediening via Video&Photos, Online videobellen voor technische ondersteuning bieden, indien nodig.